Removing an Intex pool requires careful preparation to protect the structure, surrounding landscape, and stored components. This guide walks you through a safe Intex pool take down with minimal hassle.
Follow organized steps, use the summary table for quick reference, and review common scenarios in the FAQ to complete your project efficiently.
Complete Intex Pool Take Down Preparation
Before you begin, assemble tools, document the setup, and plan for weather conditions.
| Phase | Key Action | Tools Needed | Time Estimate |
|---|---|---|---|
| Preparation | Review manual, clear area, confirm weather | Checklist, camera, notepad | 30 minutes |
| Draining | Use pump or siphon, route water away | Submersible pump, hoses | 2–4 hours |
| Disassembly | Remove frame sections, panels, fittings | Screwdriver, wrenches, storage bins | 1–2 hours |
| Storage & Maintenance | Clean, dry, label, and store components | Mild cleaner, towels, storage area | 1–2 hours |
Planning Your Intex Pool Removal Strategy
Choose between full removal, seasonal disassembly, or partial relocation based on space and future use plans.
Document part numbers and take photos so reassembly matches the original configuration and warranty conditions stay valid.
Draining The Pool Properly
Safe Water Disposal
Direct water away from foundations, landscaping, and storm drains to prevent erosion and pooling issues around your home.
Protecting The Liner
Allow the liner to dry partially before folding to reduce mold risk and avoid sharp folds that can create permanent creases.
Disassembly And Component Care
Frame And Panel Handling
Remove bolts methodically, support heavy sections with a helper, and keep screws and brackets grouped by panel.
Filter And Pump Maintenance
Empty pump chambers, rinse filters, and store electrical parts in a dry location to extend equipment life for next season.
Key Intex Pool Take Down Tips
- Drain water gradually to protect the liner and yard grading.
- Photograph and label parts to simplify reassembly.
- Use soft padding when stacking metal components.
- Inspect for damage and repair or replace parts before next season.
- Store hoses and accessories in sealed containers to prevent cracking.
- Keep a dedicated toolkit near the storage area for quick fixes.
- Review the user manual for model-specific warnings and torque specs.
- Plan storage space early to avoid last-minute scrambling.
FAQ
Reader questions
How do I know when to take down an Intex pool?
Take down at the end of the swimming season, when local temperatures stay below 10°C for several weeks, or if you notice persistent leaks or frame stress that affect safety.
Can I take down the pool myself, or should I hire help?
Most owners can manage a take down alone using a clear plan, but hire help if the pool is large, on a slope, or if you need faster turnaround or assistance with heavy components.
What should I do with leftover water and chemicals?
Disperse diluted water on absorbent areas away from structures, drain pumps to local guidelines, and dispose of chemicals through household hazardous waste programs instead of pouring them into drains or soil.
How do I store the liner and frame for the off-season?
Clean, rinse, and fully dry each part, fold the liner with light powdering, stack frame sections with protective separation, and keep the collection in a cool, dry, rodent-free location.